Building affected: 061 - FHS - Faculty of Health Sciences - Lees 200
Shutdown details: Floor Maintenance and Spring Cleaning
Start of interruption (MM/DD/YYYY HH:MM) Thu, 07/16/2026 - 23:00
End of interruption (MM/DD/YYYY HH:MM): Wed, 10/07/2026 - 07:00
Impact:Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to the building will remain available at all times.
Additional Information: Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at prs-clean@uottawa.ca
Area affected: Bike lanes along Louis-Pasteur Private between University Private and Thomas More Private
Start of interruption (MM/DD/YYYY HH:MM): Fri, 08/21/2026 - 06:00
End of interruption (MM/DD/YYYY HH:MM): Fri, 09/25/2026 - 09:00
Zone affected: Grounds
Shutdown details : Bike lanes will be periodically closed from 6 a.m. to 9 a.m. to allow deliveries and concrete pours.
Impact: During these closures, cyclists will be required to share the road with vehicles.
For more information, please contact: Martin Faubert at mfaubert@uottawa.ca
Area affected: O-Train stairwell and cyclist pathway
Start of interruption (MM/DD/YYYY HH:MM): Wed, 09/16/2026 - 07:00
End of interruption (MM/DD/YYYY HH:MM): Mon, 10/05/2026 - 12:00
Impact: The stairwell and cyclist pathway leading to and from the O-Train tunnel will each be reduced by one lane. Pedestrians will be redirected to the the other stair lanes and O-Train elevator, as required. Cyclists must dismount and walk their bicycles along the pathway.
Additional information: Traffic control specialists will be on site from 8:30 a.m. to 5:30 p.m. to direct traffic. Construction fencing will separate the reduced lanes in both the stairwell and cyclist pathway. See attached map.
For more information, please contact: Tim Lacombe at tlacombe@uottawa
Building affected: 050 - RGN - Roger Guindon - Smyth 451
Start of interruption (MM/DD/YYYY HH:MM): Thu, 09/17/2026 - 21:00
End of interruption (MM/DD/YYYY HH:MM): Fri, 09/18/2026 - 07:00
System affected: Mechanical
Shutdown details: Steam shutdown
Impact: No steam will be supplied to autoclaves, glasswashers, or humidifiers
For more information, please contact: Allan Hager at ahager@uottawa.ca
Building affected: 042 - DRO - D'Iorio - Marie Curie 10
Start of interruption (MM/DD/YYYY HH:MM): Sat, 09/19/2026 - 07:00
End of interruption (MM/DD/YYYY HH:MM): Sat, 09/19/2026 - 16:00
System affected: Electrical
Shutdown details: Electrical circuits on normal power, Complete electrical interruption, Shutdown will not affect emergency power
Impact: Electricity, water, and elevator service will be unavailable during the work. The building will be closed, and all equipment will be shut down. The shutdown will also affect GNN and BSC, which share the same power supply.
For more information, please contact: Sean Kirkwood at Sean.Kirkwood@uottawa.ca
Building affected: 050 - RGN - Roger Guindon - Smyth 451
Start of interruption (MM/DD/YYYY HH:MM): Sun, 09/20/2026 - 23:00
End of interruption (MM/DD/YYYY HH:MM): Fri, 10/02/2026 - 07:00
Interruption details: Floor maintenance and annual cleaning
Impact: Temporary traffic adjustments will be in place near the work zones. Some access points may be partially rerouted or narrowed, but building access will remain open at all times.
Additional information: See schedule
Pour plus d'informations, veuillez contacter : Team RSS au prs-clean@uottawa.ca
Building affected: 011 - MNT - Montpetit - University 125
Start of interruption (MM/DD/YYYY HH:MM): Mon, 09/21/2026 - 07:00
End of interruption (MM/DD/YYYY HH:MM): Fri, 09/25/2026 - 17:00
Zone affected: Terrace
Impact: Concrete repairs will generate jackhammering noise. The pathway will be narrowed.
Additional information: Use caution when passing through the construction zone. See the attached map for location.
For more information, please contact: Justin Champagne at jchampag@uottawa.ca